Electrical Safety Certificates Explained: EIC, EICR, Minor Works and Part P

There is no single official document called an "electrical safety certificate". People normally mean one of four things: an Electrical Installation Certificate (EIC) for new circuits, rewires and consumer unit changes, a Minor Works Certificate for small changes to an existing circuit, an EICR that checks the condition of an existing installation, or the Building Regulations compliance certificate that proves notifiable work was signed off under Part P.

Which one you need depends on whether new work has been done or an existing installation is being checked. Landlords, buyers' solicitors and insurers all ask for "the electrical certificate", and they often mean different documents. Here is what each one is, when you get it and how to replace one you have lost.

This guide is for homeowners, landlords, buyers and sellers in England. Wales, Scotland and Northern Ireland have their own building regulations, and this is general guidance on the rules as they stand in November 2026, not legal advice.

New consumer unit with RCBOs and surge protection, work covered by an Electrical Installation Certificate
A consumer unit replacement by our team. A job like this needs a full Electrical Installation Certificate and, because it is notifiable, a Building Regulations compliance certificate.

The Four Electrical Certificates at a Glance

DocumentWhen you get itWho issues itHow long it lasts
Electrical Installation Certificate (EIC)New circuit, rewire, new consumer unit, new installationThe electrician who did the workDoes not expire; records the work on that date
Minor Electrical Installation Works CertificateAdding or moving a socket, light or switch on an existing circuitThe electrician who did the workDoes not expire
Electrical Installation Condition Report (EICR)Periodic check of an existing installationA qualified electricianUntil the next inspection date on the report (5 years maximum for rentals)
Building Regulations compliance certificateAfter notifiable work under Part PThe electrician's competent person scheme, such as NAPITDoes not expire

Electrical Installation Certificate (EIC)

An EIC is issued when new electrical work is completed: a new circuit, a full or partial rewire, a consumer unit replacement, or the wiring for an extension or garden room. It records what was installed, the test results for every circuit and the signatures of the people who designed, installed and tested it. It is the document that proves the work met the wiring regulations, BS 7671, when it was finished.

Minor Works Certificate

A Minor Electrical Installation Works Certificate covers small additions or alterations to a circuit that already exists, such as adding a socket, moving a light switch or replacing a light fitting with a new one in a different position. It is shorter than an EIC because it only covers the circuit that was altered. If the work involves a new circuit, it needs a full EIC instead.

EICR: the Condition Report

An EICR is not a certificate for new work. It is an inspection of an existing installation that records anything worn, damaged or below current standards using the codes C1, C2, C3 and FI, and gives an overall result of satisfactory or unsatisfactory. For rented homes, the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require a new one at least every five years. This is the document landlords mean when they talk about a landlord electrical safety certificate, and it is what a homebuyer's surveyor usually recommends for older wiring. If yours comes back with codes, our guide to C1, C2 and C3 codes explains what happens next.

Part P and the Building Regulations Compliance Certificate

Part P of the Building Regulations covers electrical safety in homes in England. It has applied since 1 January 2005, and the 2013 revision narrowed it so that most minor work, such as replacing a socket or light fitting, no longer has to be notified. Certain jobs are "notifiable", meaning building control has to be told about them. Under Approved Document P, notifiable work is:

  • Installing a new circuit
  • Replacing a consumer unit
  • Adding to or altering a circuit in a special location, such as the zones around a bath or shower

An electrician registered with a competent person scheme can notify the work themselves. We are registered with NAPIT (the National Association of Professional Inspectors and Testers), so after notifiable work we register it, NAPIT notifies your local council, and you receive a Building Regulations compliance certificate, usually within a few weeks. Without a registered electrician, you would need to apply to your council's building control team before the work starts and pay their fee, as GOV.UK's guide to building regulations approval explains.

Which Certificate Do You Need?

SituationWhat to ask for
Letting a property in EnglandAn EICR, renewed at least every five years
Selling a house where electrical work was done since 2005The EIC or Minor Works Certificate, plus the Building Regulations compliance certificate for notifiable work
Buying an older houseAn EICR, to find out the condition before you commit
After a rewire or new consumer unitAn EIC and a Building Regulations compliance certificate
After adding a socket or moving a lightA Minor Works Certificate
Appliances in a rental or businessA PAT testing record, which is separate from all of the above

If you are buying, Electrical Safety First advises asking whether the electrics have been checked in the past ten years and asking for a copy of the EICR. Selling is where missing paperwork most often causes delays. Our guide to whether you need an EICR to sell a house covers what buyers' solicitors ask for.

Who Can Issue an Electrical Certificate?

Only a qualified electrician can issue an EIC, Minor Works Certificate or EICR, and they can only certify work they did or supervised. For notifiable work, the electrician also needs to be registered with a competent person scheme, such as NAPIT or NICEIC, to self-certify it. GOV.UK publishes the list of authorised competent person schemes. You can check an electrician is registered by searching their name on the scheme's own website before you book.

How to Replace a Lost Certificate

Start with the electrician or company that did the work, as they keep copies. For notifiable work, your local council's building control team holds a record of what was notified and when, and the competent person scheme the electrician belonged to can usually reissue the compliance certificate. There is no national online register of EICRs, unlike energy performance certificates, so a lost EICR can only come from the electrician who carried it out. If you cannot trace it, a new EICR gives you an up-to-date record, and our EICR due date checker shows when the next one is due.

Getting Certified Work in Tunbridge Wells and Kent

Our team carries out EICRs, rewires, consumer unit upgrades and smaller jobs across Tunbridge Wells, Tonbridge, Sevenoaks and the wider Kent area, and every job comes with the right certificate, notified through NAPIT where Part P applies. To book or ask what you need, get in touch for a free quote.

Frequently Asked
Questions

If you have a question we have not answered here, just get in touch with the team.

It depends which one you mean. An EICR is a separate inspection, and ours start from £150 for a smaller flat in Tunbridge Wells. An Electrical Installation Certificate or Minor Works Certificate comes with the job itself, and on our quotes all testing and certification is always included in the price.

An EIC or Minor Works Certificate does not expire, because it records work done on a particular date. An EICR states when the next inspection is due, which is no more than five years for a rented home and usually ten years for an owner-occupied one, or sooner if the electrician recommends it.

No. An electrician can only sign an Electrical Installation Certificate or Minor Works Certificate for work they carried out or supervised. For uncertified work, the options are an EICR to check its condition, or, for notifiable work, an application to your council's building control team to regularise it.

No. A gas safety certificate (often called a CP12) covers gas appliances and pipework, is renewed every year for rented homes, and is issued by a Gas Safe registered engineer. Electrical certificates cover the wiring and are issued by an electrician.